MENU

Projects

Benthal Primary School

Read More

Norbury Library

Ensigna Construction have successfully completed the renovation and refurbishment of Norbury Library

Read More

NELL GWYNNE WARD AT CHELSEA & WESTMINSTER HOSPITAL

The project comprises the refurbishment of the Nell Gwyne ward. Works completed in 10 weeks another major effort by all involved. Works including:

Read More

Kingston Hospital – Endoscopy Ward Refurbishment

Kingston Hospital – Endoscopy Ward Refurbishment

Completed September 2020 of the refurbishment of the Endoscopy Ward. The project included installation of the steel deck to accommodate the 2 AHU, Chiller and BMS Panel on roof level to service the new Endoscopy Ward on Level 7.

 

Read More

Shoreditch Park Primary School – MUGA Pitch

Ensigna Construction have successfully completed the refurbishment of a multi-use games area (MUGA) at Shoreditch Park Primary School in Hackney.

.

Read More

Chelsea & Westminster Hospital ( Labour Ward )

Complete 2019 Refurbishment of Labour Ward, including new AHU’s with DX Heating and Cooling plant HEP Filter controls all installed on the roof. Total renovation of all Birthing Suites, Delivery Theatres, New Surgeons Panels.

Mood lighting, flooring nurse base and comms.

Refurbishment involved working in a  “ live “ environment, to the highest standards, with excellent communications and  liaison with Senior Chelsea & Westminster personnel. Including out of hours shift rotations in order to maintain progress and deliver timescales.

 

Read More

Jubilee School Hackney

New roof installation at Jubilee School Hackney Removal of existing roof, followed by new installation of Bauder roof.

Read More

Kingston Hospital NHS

Kingston Hospital NHS – Kingston Coombe Ward project.

Reception area refurbishment including demolition of walls, strip-out (floor/ceilings) New doors + screens.

Read More

Office conversion to provide new maternity unit

Conversion of existing office space to provide new ward bed bays and clinical examination rooms.

Read More

Chelsea West 4th Floor Gyn

Conversion of office space into new ward area and consulting room.

Read More

Patient Transport Lounge

Reconfiguration of various office and corridor areas to provide new reception for the X-ray department. Workings included all new M&E services flooring, wall cladding doors nurse call system and reception desk.

Read More

St Georges Hospital – Trevor Howell Ward

The refurbishment and alteration of the existing chemo chair unit.

Read More

Jupiter & Neptune Paediatric Ward refurbishment

Critical services including new Medical Gases, Nurse call system, UPS and telemetry updates with programmed services interruptions.

Read More

Refurbishment of X-Ray reception

Complete refurbishment, including Strip-out / demolition of existing building.

Read More

Reconfiguration of Fry Surgical Assessment area

Refurbishment of ward to provide a pre opp surgical assessment area and consulting rooms. With waiting room, kicthen and DDA toilet facilities.

Read More

Refurbishment of Patient Transfer Lounge & medical discharge unit

Read More

Occupied High Dependency Unit

This HDU project was completed around some very challenging conditions. The ward consisted of 4 bed bays these were refurbished in phases and each one had to be completed before we started the next.

Read More

CHELSEA & WESTMINSTER HOSPITAL

Refurbishment of patient bedrooms to provide safe “Self Harm Rooms” carried out on live AAU ward

Read More

ST. JOSEPH’S HOSPICE

Extension and reconfiguration to an existing occupied care home. Works included a bereavement suit and family viewing suit, new garden and social room, Kitchen and toilet facilities, all new air handling and refrigeration equipment.

Read More

Sydenham High School

New orangery, dining hall refurbishment survery & commercial Kitchen installation

Read More

Blackheath High School

New Kitchen extension and dining hall remodeling with servery & commercial Kitchen installation

Read More

High Street Kensington

Mixture of residential, commercial and retail properties all in occupation.

Envelope repairs including stone/brick repairs and cleaning. Roofing, lead work replacements, window replacements and redecorations

Read More

Girls Day School Trust

This project was secured following the success of laboratory refurbishment carried out the previous summer.

Read More

OASIS ACADEMY HADLEY

The design and construction of a second floor extension to the South Wing of the Academy

Read More

Hackney Learning Trust

Ensigna Construction has become the largest provider of annual cyclical support to LB Hackney Schools increasing our share from £500k – £2.4m annually over the last 3 years.

Read More