Projects
Benthal Primary School
Read MoreNorbury Library
Ensigna Construction have successfully completed the renovation and refurbishment of Norbury Library
Read MoreNELL GWYNNE WARD AT CHELSEA & WESTMINSTER HOSPITAL
The project comprises the refurbishment of the Nell Gwyne ward. Works completed in 10 weeks another major effort by all involved. Works including:
Read MoreKingston Hospital – Endoscopy Ward Refurbishment
Kingston Hospital – Endoscopy Ward Refurbishment
Completed September 2020 of the refurbishment of the Endoscopy Ward. The project included installation of the steel deck to accommodate the 2 AHU, Chiller and BMS Panel on roof level to service the new Endoscopy Ward on Level 7.
Read More
Shoreditch Park Primary School – MUGA Pitch
Ensigna Construction have successfully completed the refurbishment of a multi-use games area (MUGA) at Shoreditch Park Primary School in Hackney.
.
Read MoreChelsea & Westminster Hospital ( Labour Ward )
Complete 2019 Refurbishment of Labour Ward, including new AHU’s with DX Heating and Cooling plant HEP Filter controls all installed on the roof. Total renovation of all Birthing Suites, Delivery Theatres, New Surgeons Panels.
Mood lighting, flooring nurse base and comms.
Refurbishment involved working in a “ live “ environment, to the highest standards, with excellent communications and liaison with Senior Chelsea & Westminster personnel. Including out of hours shift rotations in order to maintain progress and deliver timescales.
Read More
Jubilee School Hackney
New roof installation at Jubilee School Hackney Removal of existing roof, followed by new installation of Bauder roof.
Read MoreKingston Hospital NHS
Kingston Hospital NHS – Kingston Coombe Ward project.
Reception area refurbishment including demolition of walls, strip-out (floor/ceilings) New doors + screens.
Read MoreOffice conversion to provide new maternity unit
Conversion of existing office space to provide new ward bed bays and clinical examination rooms.
Read MoreChelsea West 4th Floor Gyn
Conversion of office space into new ward area and consulting room.
Read MorePatient Transport Lounge
Reconfiguration of various office and corridor areas to provide new reception for the X-ray department. Workings included all new M&E services flooring, wall cladding doors nurse call system and reception desk.
Read MoreSt Georges Hospital – Trevor Howell Ward
The refurbishment and alteration of the existing chemo chair unit.
Read MoreJupiter & Neptune Paediatric Ward refurbishment
Critical services including new Medical Gases, Nurse call system, UPS and telemetry updates with programmed services interruptions.
Read MoreRefurbishment of X-Ray reception
Complete refurbishment, including Strip-out / demolition of existing building.
Read MoreReconfiguration of Fry Surgical Assessment area
Refurbishment of ward to provide a pre opp surgical assessment area and consulting rooms. With waiting room, kicthen and DDA toilet facilities.
Read MoreRefurbishment of Patient Transfer Lounge & medical discharge unit
Read MoreOccupied High Dependency Unit
This HDU project was completed around some very challenging conditions. The ward consisted of 4 bed bays these were refurbished in phases and each one had to be completed before we started the next.
Read MoreCHELSEA & WESTMINSTER HOSPITAL
Refurbishment of patient bedrooms to provide safe “Self Harm Rooms” carried out on live AAU ward
Read MoreST. JOSEPH’S HOSPICE
Extension and reconfiguration to an existing occupied care home. Works included a bereavement suit and family viewing suit, new garden and social room, Kitchen and toilet facilities, all new air handling and refrigeration equipment.
Read MoreSydenham High School
New orangery, dining hall refurbishment survery & commercial Kitchen installation
Read MoreBlackheath High School
New Kitchen extension and dining hall remodeling with servery & commercial Kitchen installation
Read MoreHigh Street Kensington
Mixture of residential, commercial and retail properties all in occupation.
Envelope repairs including stone/brick repairs and cleaning. Roofing, lead work replacements, window replacements and redecorations
Read MoreGirls Day School Trust
This project was secured following the success of laboratory refurbishment carried out the previous summer.
Read MoreOASIS ACADEMY HADLEY
The design and construction of a second floor extension to the South Wing of the Academy
Read MoreHackney Learning Trust
Ensigna Construction has become the largest provider of annual cyclical support to LB Hackney Schools increasing our share from £500k – £2.4m annually over the last 3 years.
Read More